Fullerton Bridge Project

The Chicago Department of Transportation reconstructed the Fullerton Parkway Bridge in 2012. This project was approved by the Plan Commission in May 2011.
The plan will:
  • reconstruct the historic bridge and remove a pier to improve the lagoon
  • create two turning lanes onto Lake Shore Drive
  • move pedestrian access to the lakefront to the north side of the street to improve safety
  • stop accidents between pedestrians and cars trying to enter south-bound Lake Shore Drive
  • reconstruct the running path underneath the bridge
  • make pedestrian access to the lakefront ADA compliant

Images of the bridge and its placement. These images do not include planned landscaping.

GET UPDATES FROM THE 43rd WARD