Fullerton Shoreline Redevelopment Project

On August 22nd, 2014, our office, the Chicago Park District and the Chicago Department of Transportation met to present the Fullerton Shoreline Redevelopment Project.

The planned redevelopment includes:

  • Replacing the existing failed revetment with a steel and concrete revetment designed to manage waves;
  • Approximately 1700 feet of new revetment, tying into the existing revetment to the north and terminating at the southern end of the northern-most beach cell that is failed;
  • Converting the existing failed beach cell to 5.8 acres of new parkland.

Click here for the presentation of the project.

GET UPDATES FROM THE 43rd WARD